Registration Number: 2183

St. John’s Long Pond Flood Control Structure

Proponent: City of St. John’s

Summary of Environmental Assessment Process

Project Description:

The proponent is proposing to construct a flow control structure and associated flood mitigation
infrastructure at Long Pond on Rennies River in St. John’s. A flow control structure is proposed at
the outlet of Long Pond, and a cast-in-place concrete wall and two earth berms are proposed between Clinch Crescent and Prince Philip Drive.

  • January 18, 2022 – The undertaking was registered.
  • February 28, 2022 – Public comments are due.
  • March 4, 2022 – The Minister’s decision is due.
  • March 18, 2022 – The Minister’s decision is due (extended).
  • April 1, 2022 – The Minister’s decision is due (extended).
  • April 25, 2022 – The Minister’s decision is due (extended).
  • May 30, 2022 – The Minister’s decision is due (extended).
  • May 27, 2022 – The Minister announced the project is released.