Proponent: EverWind Fuels
Summary of Environmental Assessment Process
Project Description:
The Proponent is proposing to construct and operate on the Burin Peninsula: a 10 gigawatt (GW) onshore wind project consisting of three wind farms with up to 1500-turbines; three solar farms with a total of total capacity of 2.5 GW; and a 5.5 GW hydrogen/ammonia production facility north of the Town of Marystown.
- September 11, 2024 – The undertaking was registered.
- October 16, 2024 – Deadline for public comments.
- October 26, 2024 – The Minister’s decision is due.
- October 25, 2024 – The Minister determined that an Environmental Impact Statement (EIS) is required.
- October 25, 2024 – Environmental Assessment Committee (EAC) appointed.
- January 17, 2025 – Draft EIS Guidelines for public review.
- February 26, 2025 – Deadline for public comments on Draft EIS Guidelines.
- March 7, 2025 – Approved EIS Guidelines issued.
- Documents:
- Registration Document (3,840 KB)
- Appendices:
- Appendix A
- Drawings 1.1 – 4.7 (55 MB)
- Drawings 4.8 – 4.16 (40 MB)
- Appendix B – F (14 MB):
- Appendix B – Water Course and Waterbodies Names
- Appendix C – Atlantic Canda Conservation Data Centre Report
- Appendix D – Archaeological and Paleontological Desktop Summary Report
- Appendix E – Public Engagement Summary Report
- Appendix F – Environmental Protection Plan Table of Contents
- Appendix A
- Decision Letter (62 KB)
- DRAFT EIS Guidelines (631 KB)
- Decision Letter (262 KB)
- Approved EIS Guidelines (705 KB)
- Public Notices:
- Project Registered (113 KB)
- EIS Required and EAC Appointed (119 KB)
- Draft EIS Guidelines for Public Review (87 KB)
- Approved EIS Guidelines Issued (92 KB)