Proponent: Western Sno-Riders
Summary of Environmental Assessment Process
Project Description:
The Proponent is proposing to recover a washed-out Bailey bridge located 182 metres downstream from its original location on South Brook, Pasadena and replace it with a new, longer bridge. The bridge connects an existing snowmobile trail network. Construction would include clearing a short access trail to recover the old bridge using an excavator and placement of armour stone and concrete blocks on both banks of the river during installation of the new bridge
- November 1, 2024 – The undertaking was registered.
- December 6, 2024 – Deadline for public comments.
- December 16, 2024 – The Minister’s decision is due.
- December 11, 2024 – The Minister determined the Project is released.
- Documents:
- Registration Document (4 MB)
- Decision Letter (46 KB)
- Attachment A – Conditions of Release (81 KB)
- Attachment B – Regulatory Advice (124 KB)
- Public Notices:
- Project Registered (90 KB)
- Project Released (97 KB)