Projects Announced for the 2025-26 Multi-Year Roads Plan  

  • Transportation and Infrastructure

April 3, 2025

More than $316 million has been announced for highway construction projects for 2025-26, as part of the Provincial Government’s Multi-Year Provincial Roads Plan. This investment is part of the $1.4 billion over five years in improvements to provincial roads and highways announced in 2023.

The Roads Plan outlines a list of highway construction projects planned for the 2025-26 highway construction season and a partial list of projects planned for 2026-27. In addition to major highways and regional trunk roads, the plan also includes many provincially owned local roads. More details on these projects can be found in the backgrounder below.

The Honourable Fred Hutton, Minister of Transportation and Infrastructure and Minister of Rural Economic Development, will be available to speak to media about the Roads Plan today (Thursday, April 3) in the East Block Lobby, Confederation Building, beginning at 2:00 p.m. He will be joined by Kris Mulcahy, Executive Director, Heavy Civil Association of Newfoundland and Labrador.

In December of last year, residents were encouraged to provide information on roads to be considered for the plan such as region, route name or number, the nearest municipality or landmark, and the type of road issue being experienced. Over 200 suggestions were received. This information was considered along with technical input from the department’s engineers to help finalize this year’s plan.

Other significant factors in determining the list of highway construction projects selected for the plan include the impacts of climate change; commercial, industry and tourism impacts; daily traffic volumes; speed; road condition ratings; and populations serviced.

The Department of Transportation and Infrastructure has already begun issuing tenders for road construction work to begin this construction season. Tenders have been issued for various projects including:

  • Rehabilitation of Northwest Gander River Bridge (Route 360);
  • Rehabilitation of Main Tickle Bridge (Route 340);
  • Road Rehabilitation Avalon (Route 100);
  • Road Rehabilitation Avalon (Routes 70, 70-20 and 72);
  • Bridge Rehabilitation Central (Routes 340, 340-65, 360, and 390); and,
  • Road Rehabilitation on Trans Canada Highway Western from Mollichignuck Brook towards Doyles.

The department will continue issuing tenders throughout the next few months in preparation for the upcoming construction season.

Information on tenders issued and awarded by the department and other public bodies is available by visiting www.merx.com/govnl

As the road construction season approaches, motorists are asked to remain vigilant, slow down and exercise caution when travelling through construction zones. Information on active highway construction projects and repairs is also available by visiting nl511.ca or the nl511 app.

Quotes
“We recognize that roads infrastructure is critical to the social and economic well-being of residents, communities, and businesses throughout Newfoundland and Labrador. Again, this year, we have a balanced approach for addressing that infrastructure in our Roads Plan, supported by our government’s unprecedented multi-year funding commitment of $1.4 billion over five years announced in 2023. We are also pleased to continue our collaboration with the Heavy Civil Association of Newfoundland and Labrador as we approach construction season.”
Honourable Fred Hutton
Minister of Transportation and Infrastructure
Minister of Rural Economic Development

“Our association is encouraged to see that government is continuing its efforts to share provincial infrastructure priorities with the industry and the public. These updates, along with multi-year planning and timely tender releases, are key to supporting a strong and coordinated construction season. When project timelines are communicated clearly, contractors and their partners across the province can better prepare, ensuring that staffing, training, and investments are aligned with the work ahead. As we approach the upcoming season, we remain committed to working closely with government to help deliver infrastructure that strengthens communities and supports economic growth across Newfoundland and Labrador.”
Kris Mulcahy
Executive Director, Heavy Civil Association of Newfoundland and Labrador

-30-

BACKGROUNDER

Route Route Name Description 2025-26 2026-27
1 Trans Canada Highway Culvert replacements/rehabilitations between Whitbourne and St. John’s  
1 Trans Canada Highway Mill and fill sections between Whitbourne and St. John’s  
1 Trans Canada Highway Streetlight and median repairs Outer Ring Road near Carrick Drive  
1 Trans Canada Highway Rehabilitate Roaches Line underpass  
1 Trans Canada Highway Rehabilitate Foxtrap overpass  
1 Trans Canada Highway Paving section Galway Interchange  
1 Trans Canada Highway Rehabilitate Manual’s River feeder canal westbound  
1 Trans Canada Highway Rehabilitate Leech Brook Bridge  
1 Trans Canada Highway Paving sections near Grand Falls  
1 Trans Canada Highway Rehabilitate Badger Brook Bridge  
1 Trans Canada Highway Rehabilitate Big Junction Brook Bridge  
1 Trans Canada Highway Paving sections near Birchy Narrows  
1 Trans Canada Highway Paving sections between Springdale and Baie Verte  
1 Trans Canada Highway Paving sections between Glenwood and Lewisporte  
1 Trans Canada Highway Rehabilitate Little Junction Brook Bridge  
1 Trans Canada Highway Rehabilitate Middle Brook Bridge  
1 Trans Canada Highway Rehabilitate Dark Hole Brook Bridge  
1 Trans Canada Highway Removal of Port aux Basques Marine Atlantic overpass  
1 Trans Canada Highway Paving Section between Gallants and Burgeo Highway  
1 Trans Canada Highway Paving section between Doyles and Mollichignick Brook Bridge
1 Trans Canada Highway Replace Deer Lake Tailrace Bridge
1 Trans Canada Highway Replace bin walls Massey Drive  
1 Trans Canada Highway Improvements to White’s Road interchange  
1 Trans Canada Highway Construct passing lanes Port aux Basques
1 Trans Canada Highway Replace Port aux Basques Marine Atlantic overpass
3 Robert E Howlett Memorial Dr Rehabilitate Cochrane Pond underpass  
10 Southern Shore Highway Paving section between St. Shott’s and Trepassey  
10 Southern Shore Highway Paving sections near Peter’s River  
10 Southern Shore Highway Replace Witless Bay Bridge  
10 Southern Shore Highway Rehabilitate Tors Cove Bridge  
11 Petty Harbour/Maddox Cove Road Paving section  
11 Petty Harbour/Maddox Cove Road Replace culvert Petty Harbour  
20 Torbay Road Replace Pouch Cove Bridge  
20 Torbay Road Paving a section between Flatrock and Pouch Cove  
41 Beachy Cove Road Paving section  
41 Beachy Cove Road Slope stabilization near Ferry Terminal  
50 Thorburn Road at St. Thomas’ Line Replace Broad Cove Brook Bridge  
50 Thorburn Road Paving section  
60 Conception Bay Highway Paving sections near Topsail Beach and Holyrood  
70 Baccalieu Trail Replace Double Brook Bridge  
70 Baccalieu Trail Replace Ochre Pit Brook Bridge  
70 Baccalieu Trail Replace seawall Spaniard’s Bay  
70 Baccalieu Trail Paving sections Old Perlican to Bay de Verde  
70 Baccalieu Trail Paving section near Holy Redeemer School  
72 Bareneed Road Replace retaining walls in Port de Grave  
80 Trinity South Highway Replace Whiteway Bridge
80 Trinity South Highway Paving sections between Cavendish and New Melborne
81 Markland Road Rehabilitate sections  
90 Salmonier Line Replace North Arm River Bridge
90 Salmonier Line Paving sections New Bridge to Riverhead  
91 Old Placentia Bay Highway Southeast Placentia  
93 Mount Carmel Road Replace Store Gully Bridge  
94 Admiral’s Beach Road Replace culvert  
102 Ship Harbour Road Paving section Ship Harbour  
201 Main Road Bellevue Replace Chapel Arm Bridge No. 3  
210 Burin Peninsula Highway Culvert replacements  
210 Burin Peninsula Highway Rehabilitate Long Pond Brook Bridge  
210 Burin Peninsula Highway Rehabilitate Red Harbour River West Bridge  
210 Burin Peninsula Highway Rehabilitate Grand Bank Brook Bridge  
212 Harbour Mille Road Paving section near Jacques Fontaine  
213 Main Street, Frenchman’s Cove Rehabilitate Frenchman’s Cove Bridge  
215 Petite Forte Road Replace Boat Harbour Bridge  
220 Grand Bank to St. Lawrence Paving section near Epworth  
221 Main Street Burin Road Paving section near Burin  
221 Main Street Burin Road Paving sections near Port au Bras  
222 Winterland Road Paving section
230 Bonavista Peninsula Highway Replace culvert Morley’s Siding  
230 Bonavista Peninsula Highway Paving section near Lethbridge  
230 Bonavista Peninsula Highway Paving section near Bonavista  
231 Random Island Road Rehabilitate Random Island Causeway Bridge  
231 Random Island Road Paving section near Random Heights  
235 Southern Bay to Cape Bonavista Paving section near Stock Cove  
235 Southern Bay to Cape Bonavista Replace culverts Bonavista  
235 Southern Bay to Cape Bonavista Culvert replacements Open Hall to King’s Cove  
320 Bonavista North Highway Paving section near Hare Bay  
320 Bonavista North Highway Replace culvert near Trinity  
330 Gander Bay Highway Replace Windmill Brook Bridge North  
330 Gander Bay Highway Replace Windmill Brook Bridge South  
340 Road to the Isles Paving section Lewisporte to Loon Bay  
340 Road to the Isles Rehabilitate Shoal Tickle Bridge  
340 Road to the Isles Rehabilitate Main Tickle Bridge  
340 Road to the Isles Rehabilitate Southwest Brook Bridge  
340 Road to the Isles Paving section near Summerford  
340 Road to the Isles Paving section near Lobster Harbour  
345 Moreton’s Harbour Road Rehabilitation near Tizzard’s Harbour Road  
350 Botwood Highway Paving section near Botwood  
350 Botwood Highway Replace culvert near Northern Arm Depot  
350 Botwood Highway Replace culvert near Mill Pond  
351 Old TCH Replace culvert Middle Brook near Norris Arm  
360 Bay D’Espoir Highway Replace Conne River Bridge
360 Bay D’Espoir Highway Paving section  
360 Bay D’Espoir Highway Rehabilitae Bernard’s Brook Bridge  
361 St. Albans Road Rehabilitate Bay D-Espoir Causeway Bridge  
362 Belleoram Road Replace culvert near St. Jaques  
362 Belleoram Road Paving sections
363 Coomb’s Cove Road Replace culvert Coombs Cove Road  
370 Buchans Highway Paving sections
370 Buchans Highway Replace Little Red Indian Brook Bridge
380 Pilley’s Island Road Pave section near Pilley’s Island  
390 Springdale Road Rehabilitate Indian Brook Bridge  
401 Howley Road Paving section  
404 Robinson’s Road Paving sections  
405 Highland’s Road Paving sections  
410 Baie Verte Road Paving section near Flatwater Pond Park  
411 Westport Road Replace culvert near Pound Cove  
414 La Scie Highway Paving sections  
415 Nippers Harbour Road Slope stabilization  
417 Pacquet Road Replace culvert Pacquet Road  
420 Jackson’s Arm Road Rehabilitate Main River Bridge  
420 Jackson’s Arm Road Rehabilitate Gile’s Brook Bridge  
420 Jackson’s Arm Road Paving sections  
421 Road to the Beaches Rehabilitate Rocky Brook Bridge  
421 Road to the Beaches Rehabilitate Rushy Brook Bridge  
431 Trout River Road Pave sections between Glenburnie and Woody Point  
432 Main Brook Highway Paving section  
432 Main Brook Highway Rehabilitate West Brook Bridge
432 Main Brook Highway Rehabilitate Roses Brook Bridge
436 Lanse aux Meadows Road Rehabilitate Upper Brook Bridge
436 Lanse aux Meadows Road Rehabilitate Bartlett’s River Bridge  
437 Cape Onion Road Rehabilitate Eastern Brook Pond Bridge  
440 North Shore Highway Replace Ballam’s River Bridge  
450 South Shore Highway Slope stabilization  
450 South Shore Highway Paving section  
462 Mattis Point Road Slope stabilization Fox Island River  
462 Mattis Point Road Paving section Fox Island River  
470 LaPoile Highway Paving section near Rose Blanche  
480 Burgeo Highway Rehabilitate Burnt Pond Bridge  
480 Burgeo Highway Rehabilitate Dry Pond Brook Bridge  
480 Burgeo Highway Rehabilitate Lloyd’s River Bridge  
480 Burgeo Highway Replace culverts near Top Pond Brook Bridge  
480 Burgeo Highway Paving sections near Top Pond  
500 Trans Labrador Highway Replace culverts at Ossokmanuan Reservoir Causeway  
500 Trans Labrador Highway Replace Demille River culverts  
510 Southern Labrador Highway Rehabilitate Veteran’s Memorial Bridge  
514 Charlottetown Junction Rehabilitate Charlottetown Access Road  
520 North West River Road Replace Goose River Bridge  
520 North West River Road Paving section near Gosling Lake  
520 North West River Road Paving section Hamilton River Road  
100-6 Freshwater Crescent Paving section Freshwater  
100A Argentia Access Road – Collector Rehabilitation of Fitzgerald’s Pond culverts  
100A Argentia Access Road – Collector Paving section Dunville  
100B Argentia Access Road – NHS Paving sections Branch to Point Verde
100B Argentia Access Road – NHS Replace St. Bride’s Bridge North
10-34 Brigus South Road Replace culverts  
10-36 Harbour Road Rehabilitate Dean’s Road Bridge  
201-10 Bear Hill Road Replace Chapel Arm Bridge No. 2  
201-10 Bear Hill Road Rehabilitate Chapel Arm Bridge  
204-19-1 Lower Road Gooseberry Cove Replace culvert Gooseberry Cove  
204-19-3 Gooseberry Cove Road Road realignment Gooseberry Cove  
210-10-3 Old Mill Road Goobies Rehabilitate Old Mill Road Bridge  
210-19 Main Road Baine Harbour Replace retaining wall Baine Harbour  
210-21 Rushoon Access Road Rehabilitate Rushoon River Bridge  
210-23-4 Peter Coady’s Rd Jean de Baie Replace Jean De Baie Bridge  
2-1-6 Come by Chance Access Road Replace culvert Come by Chance  
220-10 Little Bay to Beau Bois Road Paving section Little Bay  
220-10 Little Bay to Beau Bois Road Paving sections near Beau Bois  
220A Mcgettigan Boulevard Replace Marystown Harbour (Canning) Bridge
220A Mcgettigan Boulevard Canning Bridge bypass  
220A Mcgettigan Boulevard Replace Marystown underpass
230A Memorial Drive Replace George’s Brook Bridge  
231-16 Hickman’s Harbour Road Replace retaining wall Hickman’s Harbour  
2A CBS Bypass – Peacekeepers Way Replace culvert Lawerence Pond interchange  
2A CBS Bypass – Peacekeepers Way Rehabilitation Route 001/002 interchange underpasses  
2B Pitts Memorial Rehabilitate CNR Viaduct  
2B Pitts Memorial Rehabilitate Blackhead Road overpass  
2B Pitts Memorial Road upgrade including storm sewer, curb and gutter, guide rail and paving
30-12 Old Marine Drive Realignment Marine Drive  
310-41 St. Brendan’s Road Granular resurfacing St. Brendan’s  
3-1-6 Benton Road Paving section Benton  
320-36 NewWesValley Road Rehabilitate Spurrell’s Island Bridge  
320-36 NewWesValley Road Paving section  
330-14 Ladle Cove Road Paving section  
330-28 Cape Freel’s Road Paving section  
362-10 Pool’s Cove Road Paving section  
3A Team Gushue Highway Team Gushue Highway
40-15 Bauline Line Extension Paving section  
414-17 Pond Road Rehabilitate Shoe Cove North Bridge  
420-10 Pollard’s Point Road Rehabilitate Pollard’s Point Bridge  
430-76 Great Brehat Road Paving section St. Anthony-Bight  
430 Northern Peninsula Highway Rehabilitate West River Bridge  
430 Northern Peninsula Highway Rehabilitate Bartlett’s Brook Arch  
430 Northern Peninsula Highway Rehabilitate Parker’s River Bridge  
430 Northern Peninsula Highway Paving sections between Black Duck Cove and Green Island Cove
430 Northern Peninsula Highway Paving sections Bonne Bay to Wiltondale
430 Northern Peninsula Highway Rehabilitate Castor River Bridge  
430 Northern Peninsula Highway Paving section near St. Anthony  
430 Northern Peninsula Highway Replace culvert near Hawke’s Bay  
430 Northern Peninsula Highway Paving sections St. Paul’s
430 Northern Peninsula Highway Paving sections near Three Mile Rock
430 Northern Peninsula Highway Remove White Hills Road Bridge  
450-1 Lewin Parkway Rehabilitate Humber Road overpasses  
50-25 Bennett’s Road and Broad Cove Road Paving section  
70-16 Bishops Cove Road Paving section  
70-17 Crane’s Road Paving section  
70-20 Bryant’s Cove Road Paving sections
92-10 Southside Road Rehabilitate sections  
  Bell Island Paving sections of Bell Island  
   Placentia Paving sections of Jerseyside, Freshwater and Southeast  
   Codroy Valley Paving sections Codroy Valley Area  
  Bay St. George Paving sections Bay St. George South Area  

 

2025 04 03 9:45 am