Full PDF of Division 5 (May 2025)
| Section # | Specification Name | Current Version | Previous Version |
| 500 | Index | 500 (May 2025) | 500 (March 2023) |
| 501 | Weighing Materials in Trucks | 501 (March 2022) | 501 (March 2012) |
| 510 | Cutting Asphaltic Pavement | 510 (March 2022) | 510 (March 2011) |
| 511 | Cutting Concrete Slab and Curb and Gutter | 511 (March 2022) | 511 (March 2011) |
| 520 | Storage or Disposal of Old Asphaltic Pavement | 520 (March 2023) | 520 (March 2022) |
| 521 | Demolition and Removal of Sidewalks, Curb and Gutter, Manholes, Catch Basins, Ditch Inlets, Fences, Guide Rails, and Guide Posts | 521 (March 2022) | 521 (March 2011) |
| 522 | Disposal or Salvage of Culvert or Pipe | 522 (March 2023) | 522 (March 2022) |
| 523 | Salvage and Reinstallation of Culvert or Pipe | 523 (March 2022) | 523 (March 2011) |
| 525 | Cutting Previously Installed Corrugated Steel Pipe | 525 (March 2022) | 525 (March 2011) |
| 530 | Supply and Installation of Traffic Light Conduit | 530 (March 2022) | 530 (March 2012) |
| 535 | Supply and Installation of Traffic Signal Foundations | 535 (March 2022) | 535 (March 2011) |
| 537 | Supply and Installation of Traffic Poles | 537 (March 2022) | 537 (March 2011) |
| 540 | Cast-In-Place Concrete Median Barrier | 540 (May 2025) | 540 (March 2022) |
| 541 | Precast Concrete Traffic Barrier | 541 (May 2025) | 541 (March 2022) |
| 570 | Installation of Concrete Sidewalk | 570 (May 2025) | 570 (March 2022) |
| 575 | Installation of Asphalt Sidewalk | 575 (March 2022) | 575 (March 2011) |
| 580 | Sign and Signpost Installations | 580 (May 2025) | 580 (March 2022) |
| 582 | Disposal or Salvage of Signs and Signposts | 582 (March 2022) | 582 (March 2011) |
| 583 | Salvage and Reinstallation of Signs and Signposts | 583 (March 2022) | 583 (March 2011) |
| 590 | Wood Preservation | 590 (March 2011) | N/A |