Proponent: World Wildlife Fund Canada
Summary of Environmental Assessment Process
Project Description:
The proponent proposes to restore biological conditions at the mouth of Parker’s River that are necessary for the survival of key life stages of Arctic Char and Atlantic Salmon and to help maintain their local populations. The project area is approximately 4225 square metres and is located near Cook’s Harbour on the Great Northern Peninsula.
The major undertakings include dredging and bank stabilization in the river channel. Large wood will placed in the channel banks at the location of the new pools to provide critical cover habitat for the fish. The access road south of the river may be upgraded to allow for heavy equipment if necessary. No new road construction is required. The access and staging areas will be revegetated with native seed, trees and shrubs.
- July 2, 2021 – The undertaking was registered.
- August 6, 2021 – Deadline for public comments.
- August 16, 2021 – The Minister’s decision is due.
- September 16, 2021 – The Minister announced the project is released.
- Documents:
- Registration (465 KB)
- Appendix A – Design (3.1 MB)
- Appendix B – Technical Memo (379 KB)
- Decision Letter (142 KB)
- Registration (465 KB)
- Public Notices:
- Project Registered (393 KB)
- Project Released (140 KB)
Adobe® Acrobat® Reader software can be used for viewing PDF documents. Download Acrobat® Reader for free